• Transportation survey: Liberty Central School District has emailed a form to all district families asking them to update their information regarding transportation for the 2026-27 school year.  Forms must be filled out by June 30. If you have not received the form, please call the Business Office at 845-292-6171.
  • Registration: There are open slots available for the 2026-27 pre-kindergarten class, and a lottery will not take place. Remaining seats will be filled on a first-come, first-served basis. Kindergarten registration is also now open. Find more information about registration for the programs here.
  • Construction update: Construction work has begun on the maintenance building. The walkway behind the district office from Winthrop Avenue to the high school is closed until further notice. Also, the athletic field and track area is no longer accessible to the public.  The area will be closed as construction continues. The soccer, baseball and softball fields remain open.

Village to flush water system, possibly impacting water at school buildings

The village of Liberty will flush its water mains by opening hydrants throughout the system starting next week. This may cause low water pressure and water throughout the village to become brown. The water will not be contaminated.

The flushing will likely impact the Liberty Elementary, Middle and High Schools and the District Office.

Flushing of the Parksville transmission line will take place June 8-12, with the Village Water System  starting June 15 until complete. Flushing will take place from 8 a.m. to 3 p.m. Mondays through Fridays.

If water begins to get brown in a building, water fountains will be temporarily shut down until the water clears. Bottled water will be available if fountains are shut down. All staff and students are encouraged to limit water use.

Updates will be available on the village website.